- BID · T−0.5 YR
- The site is captured before the number is priced — what the ground is, not what the tender pack says it is.
- BUILD · T0 → T+3.0 YR
- 156 registered epochs at a weekly cadence, each one a survey the next is differenced against.
- CLAIM · MONTHLY ×36
- Every valuation is read against installed quantity in units, with the frames that measured it attached.
- HANDOVER · T+3.0 YR
- The as-built falls out of the record — including what the drywall closed over, on the day it closed.
- DLP · T+3.0 → T+6.0 YR
- Defects liability runs against the handover epoch. Retention releases against measurement, not against a meeting.
- INSURANCE · T+6.4 YR
- Pre-loss condition is already on file, so a claim starts from a measured baseline instead of a memory.
- INSPECTION · FROM T+7 YR
- Statutory regimes become capture programmes: the same points re-measured, ± stated, trajectory plotted.
- DISPUTE · T+12 YR
- The programme is read back epoch by epoch — what was there on a date, and what was known on that date.
- OPERATE · T+30 YR
- The asset keeps a medical record. The people who built it have moved on; the record has not.