Skip to content

CAPTURING · SECTOR 7 · 06:12:44

LAT 17.4062 · LON 78.4691 · GSD 1.8CM/PX

The ground truth of construction

BUILD ON GROUND TRUTH

Drones capture it. Robots verify it. One brain understands it. GroundReality is the platform where what’s really happening on site becomes how your company builds.

RECORD · 175 COUNTRIES · 2.4M PROJECTS

2.4M

Projects on the record

21T

Sq ft of visual site data

175

Countries with active sites

$1.3T

Of construction managed

Building on ground truth

Meridian Build GroupHalcyon InfrastructureNorthgate DevelopmentIronline MEPCassia HomesBluevein Data CentresOstrander EnergySable & Port
PLATFORM · 9 PRODUCTS · 1 BRAIN
SEQUENCE · 4 STEPS · ONE WEEK

HOW IT RUNS

ONE WEEK ON THE JOB.

Capture on Monday, verification on Wednesday, a claim you can defend on Friday, and a bid on Sunday night that prices itself from all of it.

01 / 04

Fly the site

A dock launches on Monday at 06:00 and the whole site is on the map by the huddle: orthomosaic at 1.8 cm per pixel, a 3D model, and cut/fill against the design surface. Nobody waits three weeks for a surveyor to come back.

FLIGHT · 214 HA · 1.8CM/PX

Flight plan · 5 passes · 78% overlap

02 / 04

Walk the floors

A 360 camera on a hard hat covers a level in six minutes. Every frame is pinned to the floor plan, laid over the model, and kept — so what is behind the drywall on level 14 is still on the record two years after handover.

WALK · 38 FLOORS · 6 MIN/LEVEL

Level 14 · 41 stations · pinned to the plan

03 / 04

Run the job

RFIs, submittals, drawing revisions, daily logs and the budget all sit on one record — and the pay application is checked against the capture that proves the work is installed, not against a photo somebody remembered to take.

RFI-0047 · CLOSED 3.2D

One job record · office and field, same line

04 / 04

Win the next one

The brain reads the whole tender — drawings, specs, contract — flags the liquidated-damages clause on page 611, repackages the RFP by trade, and prices the estimate from the jobs you have already built.

TENDER · 1,284 PP · READ 9 MIN

Tender packet · 1,284 pages · read in 9 min

FLEET · 5 UNITS · ALL REPORTING

THE FLEET

EVERY MACHINE, ON THE RECORD.

Every instrument on the site feeds the same record. Load cycles off the crane, cut volumes off the excavator, captures off the dock, interior walks off the robot, control points off the station — one yard, one record, nothing recalled from memory at the end of the month.

What the platform reads off each unit

ELEVATIONS · PLATES NOT TO COMMON SCALE
PARAM 1.4B · ROLES 27 · CITED 100%

ENTERPRISE AI BRAIN

ONE BRAIN. EVERY ROLE.

Everything above this line trains it. Every capture, every RFI, every change order, every bid won and lost becomes weights in a deep network dedicated to your organization — never pooled, never used to train anyone else's model. One brain, projected differently for each of the 27 roles it serves, and every answer cited to the frame, revision or clause it came from.

ROLE · SUPER · 06:20

Superintendent

Tomorrow's sequencing risk before the huddle: two trades stacked on level 14, a pour that slips if the pump lands late, and the RFI still open underneath it.

ROLE · ESTIMATOR · BID-2291

Estimator

Win probability against every package you have ever priced, with the cost deltas that explain it — each one traced back to the job it was learned from.

ROLE · CFO · 60 JOBS

CFO

Cash exposure across the portfolio, with every progress claim tied to installed work that was verified from capture rather than asserted in a meeting.

OUTCOMES · 3 BUILDERS · CITED

OUTCOMES

WHAT THE RECORD SETTLED.

Four builds are documented end to end on the customers page. These are three of the lines from them.

GC · 41 TOWERS · 82 TRADES
Progress disputes used to run on whoever remembered the day better. Now the record settles them, and the meeting is twenty minutes shorter.
Project executiveMeridian Build Group
  • $18M contested claims settled
  • 0 progress disputes open
  • 82 trades verified by Progress AI
CIVIL · 34 KM · FLIGHT/6H
The corridor is flown every six hours. Earthworks quantities are reconciled overnight, so nobody argues about dirt in the morning.
Project directorHalcyon Infrastructure
  • 34 km highway corridor
  • Quantities reconciled nightly
  • 11% under budget at handover
MEP · BID 3.1× · CITED 100%
We bid three times the volume with the same estimating team. The brain found a liquidated-damages clause on page 611 that would have taken the margin.
Chief estimatorIronline MEP
  • 3.1× bid volume
  • 56 hours saved per PM per month
  • 0% institutional knowledge lost
CONTACT · SALES · REPLY 1 BUS. DAY

See your ground truth.

Talk to our team about your portfolio, your sites, and what the Brain can learn from them.