Index · 48 capabilities · 8 products
The capability sheet.
Everything the platform does, on one sheet — grouped the way the platform is built: capture it, build with it, win the next one. Every row is a page.
Capture · AER
Aerial
Drone mapping and survey — the whole site from above, on the coordinate system your engineers already work in.
- AER-01Orthomosaic mapsSurvey-grade 2D maps from any drone flightGSD 1.8CM/PX · 214 HA/FLIGHT
- AER-023D models & DEMsPhotogrammetry meshes and elevation models of the whole siteMESH 40M FACES · DEM 5CM
- AER-03RTK/PPK accuracySub-inch repeatable accuracy without laying GCPs every flightFIX ±1.2CM · SATS 28
- AER-04Head of the Enterprise AI Brain.Cut/fill & stockpilesEarthworks quantities and stockpile volumes reconciled against designVOLUME ±1.8% · NIGHTLY
- AER-05Thermal & facade inspectionRadiometric thermal and vertical facade capture for envelope and asset healthΔ0.1°C · FACADE 2CM/PX
- AER-06Live MapMaps processed on the controller, in the field, offline40MIN CAPTURE→MAP · OFFLINE
Capture · GRD
Ground
360° walks pinned to the drawing, so the floor and the model can be read side by side.
- GRD-01360° walksWeekly floor walks auto-pinned to drawings8 FLOORS/HR · AUTO-PINNED
- GRD-02BIM vs builtOverlay capture on the model; drift caught while it's cheapREV C VS BUILT · Δ FLAGGED
- GRD-03Punch & issue taggingTag an issue on the frame; it lands in the record assignedTAG→ASSIGN 12S
- GRD-04Head of the Enterprise AI Brain.Progress by tradePercent complete by area across 80+ trades, no BIM required82 TRADES · MINUTES
- GRD-05Pay-app verificationBilling lines tied to frames that prove installed workCLAIMED VS VERIFIED
- GRD-06Privacy blurringFaces and bodies blurred automatically before anyone sees a frameAUTO · 100% OF FRAMES
Capture · AUT
Autonomy
Docked drones and ground robots capturing on a schedule, with nobody driving to site.
- AUT-01Dock automationScheduled flights from a rooftop box; nobody drives to site2×/DAY · 0 PILOTS
- AUT-02Ground robot fleetQuadrupeds walking interiors on scheduleSHIFT 14KM · STAIRS OK
- AUT-03Mission schedulingOne calendar for every autonomous capture on the portfolio12M MISSIONS
- AUT-04Auto upload & processingData lands processed before the morning huddleCAPTURE→RECORD 40MIN
- AUT-05Head of the Enterprise AI Brain.Robotic inspectionThermal/RGB/360 asset rounds by robotROUNDS 4/DAY
- AUT-06Fleet securityHardware-hardened links for every drone and robotSIGNED FIRMWARE · SOC 2
Build · PMG
Project Management
RFIs, submittals, drawings and logs — office and field working off one record with the clock running.
- PMG-01RFIs & submittalsQuestions and approvals on one record with the clock runningMEAN CLOSE 3.2D
- PMG-02Drawing controlEvery sheet current, every revision comparedREV COMPARE · 0 STALE SHEETS
- PMG-03Head of the Enterprise AI Brain.Auto daily logsLogs drafted from capture; the super edits, doesn't typeDRAFTED 06:00
- PMG-04Scheduling & lookaheadsLookaheads that read capture velocity, not optimismWK-34 LOOKAHEAD
- PMG-05Meetings & actionsMinutes with owners and deadlines that chase themselvesACTIONS TRACKED
- PMG-06Field appThe record in a pocket, offline on the slabOFFLINE · 44PX GLOVES
Build · FIN
Financials
Budgets, change orders and claims checked against the work capture can prove is installed.
- FIN-01Budget & forecastingLive budget lines against verified installed workVARIANCE 11%↓
- FIN-02Change ordersScope change priced, routed, and on the record in hoursPRICED $84K · ROUTED
- FIN-03Progress claimsClaims assembled from the record, defended by framesCLAIM WK · EVIDENCED
- FIN-04Capture-verified billingPay for work that is provably thereCLAIMED VS VERIFIED
- FIN-05Head of the Enterprise AI Brain.Cash-flow projectionPortfolio cash exposure, projected by the Brain60 JOBS · CITED
- FIN-06ERP syncBoth systems agree, nightly, without a spreadsheetNIGHTLY · 2-WAY
Build · QAS
Quality & Safety
Inspections, observations and incidents on the record — and every frame scanned for hazards.
- QAS-01Inspection templatesYour checklists, structured, on every phase gateTEMPLATES 214
- QAS-02Observations & issuesAnything seen, logged, assigned, and closedMEAN TTR 4.1H
- QAS-03Incident managementWhen it happens: record, notify, learn — fastNOTIFY <5MIN
- QAS-04Head of the Enterprise AI Brain.Safety AIEvery frame scanned for OSHA-aligned hazardsDETECTION 94% · RANKED
- QAS-05QA checkpointsStructured gates that catch it while it's fixableGATES/PHASE 12
- QAS-06Toolbox talksAttendance and topics on the recordCREWS 27 · LOGGED
Build · WFC
Workforce
Crews, equipment and materials planned by the shift and tracked against what got installed.
- WFC-01Crew planning & dispatchThe right crew on the right day, portfolio-wideUTIL 87%
- WFC-02Geofenced timesheetsHours that match the gate cameraAUTO-PUNCH · DISPUTES↓
- WFC-03Equipment utilizationIdle iron found and re-deployedIDLE 9%↓ · GPS
- WFC-04Materials & laydownEvery delivery located in the yard from captureLAYDOWN MAPPED
- WFC-05Certification managementTickets current before the task needs themEXPIRY FLAGGED 30D
- WFC-06Head of the Enterprise AI Brain.Production trackingInstalled quantities vs estimate, by crewQTY VS EST · DAILY
Win · BID
Bid Intelligence
Whole tender packages read, priced from your own history and scored before the deadline.
- BID-01Head of the Enterprise AI Brain.Tender ingestionThe whole package read before your first coffee2,400 PAGES · 9 MIN
- BID-02Head of the Enterprise AI Brain.RFP repackagingTrade-specific bundles cut from the master set in minutesBUNDLES 14 · 15 MIN
- BID-03Head of the Enterprise AI Brain.Contract reviewClauses checked against construction law and precedentRULINGS 300+ · CITED
- BID-04Head of the Enterprise AI Brain.Cost-history estimatingEstimates priced from every job you've doneOWN HISTORY · ±3%
- BID-05Head of the Enterprise AI Brain.Win probabilityBid the work you can win at marginSCORED · CALIBRATED
- BID-06Head of the Enterprise AI Brain.Knowledge baseInstitutional memory that doesn't retire0% LOST · SEARCHABLE